Cost to Basement Support Column Replacement in Seattle, WA

$1,920$5,120 in Seattle

28% above the national average · 1.28x cost multiplier

In Seattle, a basement support column replacement runs $1,920 to $5,120 on average — about 28% above what homeowners pay nationwide. The West Coast market's labor costs account for most of the gap, with material pricing and local permitting fees adding to the spread. Use the cost table below to compare budget, mid-range, and premium options side by side.

Cost Breakdown in Seattle

Line ItemLowMidHigh
Materials$256$640$1,536
Labor$768$1,536$3,200
Permits$128$192$384
Total$1,152+28% vs. national avg$2,624+28% vs. national avg$5,760+28% vs. national avg

Budget

Single adjustable steel lally column replacement, existing footing in good condition

Mid-Range

1-2 column replacements with new concrete footings, structural engineering review

Premium

Multiple column replacements, new footings, beam upgrades, decorative column wraps, engineered plans

Material Options

Material prices below are national averages; availability in Seattle may shift costs slightly.

MaterialCost/UnitBest For
Adjustable Steel Lally Column$50-$150/columnUnfinished basements, standard replacementsMost common, adjustable height, affordable, proven reliability
Permanent Steel Column (Concrete-Filled)$100-$250/columnPermanent installations, higher load requirementsStronger than adjustable, no moving parts, permanent solution
Structural Wood Post (6x6 or larger)$75-$200/columnFinished basements where appearance matters, lower loadsEasy to work with, can be stained or painted, traditional look
Decorative Column Wrap (over steel)$150-$500/columnFinished basements, columns in living spacesHides the steel column, matches finished basement aesthetics, various styles

Other Projects in Seattle

Seattle Estimate

Typical Range

$1,920$5,120

vs. National Average

28% above national

Cost Multiplier

1.28x

Estimates apply Seattle's 1.28x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →