Cost to Full Kitchen Remodel in Seattle, WA

$18,560$53,120 in Seattle

28% above the national average · 1.28x cost multiplier

In Seattle, a full kitchen remodel runs $18,560 to $53,120 on average — about 28% above what homeowners pay nationwide. The West Coast market's labor costs account for most of the gap, with material pricing and local permitting fees adding to the spread. Use the cost table below to compare budget, mid-range, and premium options side by side.

Cost Breakdown in Seattle

Line ItemLowMidHigh
Cost per sq ft$96$192$320
Materials$7,680$20,480$53,760
Labor$7,040$17,920$35,840
Permits$640$1,024$1,536
Total$15,360+28% vs. national avg$40,960+28% vs. national avg$96,000+28% vs. national avg

Budget

Cosmetic refresh - paint cabinets, new hardware, laminate countertops, budget appliances, LVP flooring

Mid-Range

New semi-custom cabinets, quartz countertops, mid-range appliances, tile backsplash, hardwood flooring

Premium

Custom cabinets, marble or premium quartz countertops, professional-grade appliances, custom lighting, structural changes

Material Options

Material prices below are national averages; availability in Seattle may shift costs slightly.

MaterialCost/UnitBest For
Laminate Countertops$20-$50/sq ftBudget remodels, rental propertiesMost affordable, many styles available
Granite Countertops$40-$200/sq ftMid-range to premium remodelsNatural stone, heat resistant, high-end look
Quartz Countertops$50-$200/sq ftMost popular mid-range to premium choiceLow maintenance, consistent color, very durable
Marble Countertops$100-$250/sq ftPremium remodels, statement piecesLuxury aesthetic, unique veining, high resale value
Butcher Block Countertops$35-$200/sq ftFarmhouse or traditional kitchen stylesWarm look, food-safe surface, repairable

Other Projects in Seattle

Seattle Estimate

Typical Range

$18,560$53,120

vs. National Average

28% above national

Cost Multiplier

1.28x

Cost Per sq ft

$96–$320

Estimates apply Seattle's 1.28x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →