Cost to Staircase Remodel in Denver, CO
$2,240–$8,960 in Denver
12% above the national average · 1.12x cost multiplier
Expect to pay $2,240–$8,960 for a staircase remodel in Denver, about 12% above the national benchmark. The Mountain West region's contractor market and material costs account for most of this difference. The detailed breakdown below shows how budget, mid-range, and premium projects compare at Denver prices.
Cost Breakdown in Denver
| Line Item | Low | Mid | High |
|---|---|---|---|
| Materials | $560 | $2,016 | $5,040 |
| Labor | $784 | $2,240 | $3,920 |
| Permits | $0 | $112 | $224 |
| Total | $1,344+12% vs. national avg | $4,592+12% vs. national avg | $9,744+12% vs. national avg |
Budget
Cosmetic updates: new treads over existing, paint risers, replace balusters with matching style
Mid-Range
Full tread and riser replacement, new railing system, hardwood treads, iron or wood balusters
Premium
Complete staircase rebuild with custom hardwood, wrought iron or cable railing, curved or floating design elements
Material Options
Material prices below are national averages; availability in Denver may shift costs slightly.
| Material | Cost/Unit | Best For |
|---|---|---|
| Tread Caps (Over Existing) | $25-$50/tread | Budget cosmetic updates, covering worn carpet stairsMost affordable, fastest install, no demolition needed |
| Red Oak Treads | $40-$80/tread | Most common choice, traditional homes, stained finishesClassic look, durable, takes stain well, widely available |
| White Oak/Maple Treads | $60-$100/tread | Modern and contemporary homes, light or natural finishesHarder than red oak, smoother grain, modern appearance |
| Walnut/Hickory Treads | $80-$150/tread | High-end homes, dramatic focal-point staircasesStunning appearance, very hard, rich color, statement piece |
Other Projects in Denver
Denver Estimate
Typical Range
$2,240–$8,960
vs. National Average
12% above national
Cost Multiplier
1.12x
Estimates apply Denver's 1.12x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.