Cost to Second Story Addition in Las Vegas, NV
$100,000–$300,000 in Las Vegas
Same as the national average · 1.00x cost multiplier
Expect to pay $100,000–$300,000 for a second story addition in Las Vegas, right at the national benchmark. The Mountain West region's contractor market and material costs account for most of this difference. The detailed breakdown below shows how budget, mid-range, and premium projects compare at Las Vegas prices.
Cost Breakdown in Las Vegas
| Line Item | Low | Mid | High |
|---|---|---|---|
| Cost per sq ft | $150 | $250 | $400 |
| Materials | $40,000 | $75,000 | $140,000 |
| Labor | $50,000 | $85,000 | $140,000 |
| Permits | $5,000 | $8,000 | $12,000 |
| Design | $7,000 | $12,000 | $25,000 |
| Total | $102,000+0% vs. national avg | $180,000+0% vs. national avg | $317,000+0% vs. national avg |
Budget
Full second story over a 1,000 sq ft footprint with standard materials, vinyl siding, builder-grade windows, and basic finishes. Minimal interior customization.
Mid-Range
1,200 sq ft second story with mid-grade finishes, fiber cement siding, energy-efficient windows, 3 bedrooms, 2 bathrooms, and dedicated HVAC system.
Premium
1,500+ sq ft second floor with custom architectural design, premium finishes, vaulted ceilings, master suite with luxury bath, and full structural engineering.
Material Options
Material prices below are national averages; availability in Las Vegas may shift costs slightly.
| Material | Cost/Unit | Best For |
|---|---|---|
| Wood Frame with Vinyl Siding | $150-$200 per sq ft | Budget-conscious projects on homes that already have vinyl sidingMost affordable construction method, fast framing, widely available contractors |
| Wood Frame with Fiber Cement Siding | $200-$280 per sq ft | Mid-range additions where exterior quality and longevity matterDurable, paintable, low maintenance, matches most existing home styles, fire-resistant |
| Wood Frame with Brick Veneer | $250-$350 per sq ft | Brick ranch homes where matching the exterior is critical for resaleExcellent curb appeal, matches brick first floors seamlessly, very durable |
| Structural Insulated Panels (SIPs) | $220-$320 per sq ft | Energy-conscious homeowners in climate extremes who want long-term utility savingsSuperior insulation, faster framing, energy-efficient, airtight construction |
| Modular / Prefab Second Story | $130-$220 per sq ft | Straightforward rectangular footprints where speed and cost control are prioritiesFactory-built sections reduce on-site time, weather exposure, and labor costs |
Other Projects in Las Vegas
Las Vegas Estimate
Typical Range
$100,000–$300,000
vs. National Average
Same as national
Cost Multiplier
1.00x
Cost Per sq ft
$150–$400
Estimates apply Las Vegas's 1.00x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.
See national average costs →