Cost to Deck Repair in Albuquerque, NM

$690$3,220 in Albuquerque

8% below the national average · 0.92x cost multiplier

Expect to pay $690–$3,220 for a deck repair in Albuquerque, about 8% below the national benchmark. The Southwest region's contractor market and material costs account for most of this difference. The detailed breakdown below shows how budget, mid-range, and premium projects compare at Albuquerque prices.

Cost Breakdown in Albuquerque

Line ItemLowMidHigh
Cost per sq ft$5$11$23
Materials$184$644$1,840
Labor$276$828$1,840
Permits$0$69$138
Total$460-8% vs. national avg$1,541-8% vs. national avg$3,818-8% vs. national avg

Budget

Minor repairs: replacing a few boards, tightening hardware, minor railing fixes

Mid-Range

Moderate repairs: replacing 20-30% of deck boards, railing replacement, stair repair, re-staining

Premium

Major repairs: joist replacement, ledger board repair, full railing replacement, structural reinforcement

Material Options

Material prices below are national averages; availability in Albuquerque may shift costs slightly.

MaterialCost/UnitBest For
Pressure-Treated Lumber$3-$6/sq ftBudget repairs, matching existing pressure-treated decksMost affordable, widely available, can be stained any color
Cedar/Redwood$6-$10/sq ftHigher-end wood decks, natural appearance preferenceNaturally rot-resistant, beautiful grain, can be left to weather naturally
Composite (Trex, TimberTech)$8-$15/sq ftLow-maintenance priority, upgrading from wood, long-term valueVery low maintenance, won't rot or splinter, long-lasting, consistent appearance
PVC Decking$10-$18/sq ftPool decks, wet climates, maximum durabilityFully waterproof, no organic material to rot, mold-resistant

Other Projects in Albuquerque

Albuquerque Estimate

Typical Range

$690$3,220

vs. National Average

8% below national

Cost Multiplier

0.92x

Cost Per sq ft

$5–$23

Estimates apply Albuquerque's 0.92x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →