Cost to Basement Support Column Replacement in Tucson, AZ

$1,395$3,720 in Tucson

7% below the national average · 0.93x cost multiplier

Expect to pay $1,395–$3,720 for a basement support column replacement in Tucson, about 7% below the national benchmark. The Southwest region's contractor market and material costs account for most of this difference. The detailed breakdown below shows how budget, mid-range, and premium projects compare at Tucson prices.

Cost Breakdown in Tucson

Line ItemLowMidHigh
Materials$186$465$1,116
Labor$558$1,116$2,325
Permits$93$140$279
Total$837-7% vs. national avg$1,907-7% vs. national avg$4,185-7% vs. national avg

Budget

Single adjustable steel lally column replacement, existing footing in good condition

Mid-Range

1-2 column replacements with new concrete footings, structural engineering review

Premium

Multiple column replacements, new footings, beam upgrades, decorative column wraps, engineered plans

Material Options

Material prices below are national averages; availability in Tucson may shift costs slightly.

MaterialCost/UnitBest For
Adjustable Steel Lally Column$50-$150/columnUnfinished basements, standard replacementsMost common, adjustable height, affordable, proven reliability
Permanent Steel Column (Concrete-Filled)$100-$250/columnPermanent installations, higher load requirementsStronger than adjustable, no moving parts, permanent solution
Structural Wood Post (6x6 or larger)$75-$200/columnFinished basements where appearance matters, lower loadsEasy to work with, can be stained or painted, traditional look
Decorative Column Wrap (over steel)$150-$500/columnFinished basements, columns in living spacesHides the steel column, matches finished basement aesthetics, various styles

Other Projects in Tucson

Tucson Estimate

Typical Range

$1,395$3,720

vs. National Average

7% below national

Cost Multiplier

0.93x

Estimates apply Tucson's 0.93x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →