Cost to Basement Support Column Replacement in Raleigh, NC

$1,350$3,600 in Raleigh

10% below the national average · 0.90x cost multiplier

Homeowners in Raleigh typically spend $1,350–$3,600 on a basement support column replacement, about 10% below the national average. Labor rates and contractor availability in the Southeast region drive much of the price difference. Permit requirements and material delivery costs also play a role. See the full tier-by-tier breakdown below before requesting bids.

Cost Breakdown in Raleigh

Line ItemLowMidHigh
Materials$180$450$1,080
Labor$540$1,080$2,250
Permits$90$135$270
Total$810-10% vs. national avg$1,845-10% vs. national avg$4,050-10% vs. national avg

Budget

Single adjustable steel lally column replacement, existing footing in good condition

Mid-Range

1-2 column replacements with new concrete footings, structural engineering review

Premium

Multiple column replacements, new footings, beam upgrades, decorative column wraps, engineered plans

Material Options

Material prices below are national averages; availability in Raleigh may shift costs slightly.

MaterialCost/UnitBest For
Adjustable Steel Lally Column$50-$150/columnUnfinished basements, standard replacementsMost common, adjustable height, affordable, proven reliability
Permanent Steel Column (Concrete-Filled)$100-$250/columnPermanent installations, higher load requirementsStronger than adjustable, no moving parts, permanent solution
Structural Wood Post (6x6 or larger)$75-$200/columnFinished basements where appearance matters, lower loadsEasy to work with, can be stained or painted, traditional look
Decorative Column Wrap (over steel)$150-$500/columnFinished basements, columns in living spacesHides the steel column, matches finished basement aesthetics, various styles

Other Projects in Raleigh

Raleigh Estimate

Typical Range

$1,350$3,600

vs. National Average

10% below national

Cost Multiplier

0.90x

Estimates apply Raleigh's 0.90x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →