Cost to Kitchen Faucet Replacement in Boise, ID
$263–$683 in Boise
5% above the national average · 1.05x cost multiplier
Expect to pay $263–$683 for a kitchen faucet replacement in Boise, about 5% above the national benchmark. The Mountain West region's contractor market and material costs account for most of this difference. The detailed breakdown below shows how budget, mid-range, and premium projects compare at Boise prices.
Cost Breakdown in Boise
| Line Item | Low | Mid | High |
|---|---|---|---|
| Materials | $84 | $236 | $578 |
| Labor | $105 | $158 | $263 |
| Permits | $0 | $0 | $0 |
| Total | $189+5% vs. national avg | $394+5% vs. national avg | $840+5% vs. national avg |
Budget
Basic chrome pull-out or two-handle kitchen faucet, direct swap on existing single or three-hole mount.
Mid-Range
Pull-down faucet in brushed nickel or stainless with new supply lines, shut-off valve replacement, and deck plate.
Premium
Touchless or commercial-style spring faucet with premium finish, soap dispenser addition, and new shut-off valves.
Material Options
Material prices below are national averages; availability in Boise may shift costs slightly.
| Material | Cost/Unit | Best For |
|---|---|---|
| Two-Handle Kitchen Faucet | $60-$150 | Traditional kitchens or budget replacementsTraditional look, easy to control water temperature, affordable |
| Pull-Down Single-Handle | $120-$300 | Most kitchens - this is the most popular style for good reasonMost versatile, tall spout clears large pots, retractable sprayer, one-handed operation |
| Touchless/Motion-Sensor | $200-$500 | Busy kitchens where hands are frequently messyHands-free activation, reduces cross-contamination when cooking, saves water |
| Commercial-Style Spring Faucet | $250-$700 | Large kitchens with serious home cooks who want a statement fixtureProfessional look, powerful spray, industrial coil design is a focal point |
Other Projects in Boise
Boise Estimate
Typical Range
$263–$683
vs. National Average
5% above national
Cost Multiplier
1.05x
Estimates apply Boise's 1.05x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.
See national average costs →