Cost to Bathroom Faucet Replacement in Los Angeles, CA

$270$743 in Los Angeles

35% above the national average · 1.35x cost multiplier

In Los Angeles, a bathroom faucet replacement runs $270 to $743 on average — about 35% above what homeowners pay nationwide. The West Coast market's labor costs account for most of the gap, with material pricing and local permitting fees adding to the spread. Use the cost table below to compare budget, mid-range, and premium options side by side.

Cost Breakdown in Los Angeles

Line ItemLowMidHigh
Materials$81$236$608
Labor$135$203$338
Permits$0$0$0
Total$216+35% vs. national avg$439+35% vs. national avg$945+35% vs. national avg

Budget

Basic chrome single-handle or centerset faucet, direct swap on existing mounting holes.

Mid-Range

Widespread faucet in brushed nickel with pop-up drain assembly replacement and new supply lines.

Premium

Designer wall-mount or vessel faucet with specialty finish, new shut-off valves, and vanity top modification.

Material Options

Material prices below are national averages; availability in Los Angeles may shift costs slightly.

MaterialCost/UnitBest For
Centerset Faucet (4" spread)$40-$150Quick upgrades on standard bathroom vanitiesMost affordable, single-unit install, widely available in all finishes
Widespread Faucet (8" spread)$100-$400Mid-range to upscale bathroom updates on wider vanity topsMore elegant look, three separate pieces allow flexible placement, upscale appearance
Single-Hole Vessel Faucet$80-$350Modern bathrooms with vessel sinks or contemporary vanitiesModern look, tall reach for vessel sinks, single hole simplifies installation
Wall-Mount Faucet$200-$600Designer bathrooms and high-end remodels with floating vanitiesSaves vanity space, distinctive look, easy countertop cleaning

Other Projects in Los Angeles

Los Angeles Estimate

Typical Range

$270$743

vs. National Average

35% above national

Cost Multiplier

1.35x

Estimates apply Los Angeles's 1.35x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →