Cost to Drywall Repair in Baltimore, MD

$177$1,180 in Baltimore

18% above the national average · 1.18x cost multiplier

Expect to pay $177–$1,180 for a drywall repair in Baltimore, about 18% above the national benchmark. The Northeast region's contractor market and material costs account for most of this difference. The detailed breakdown below shows how budget, mid-range, and premium projects compare at Baltimore prices.

Cost Breakdown in Baltimore

Line ItemLowMidHigh
Cost per repair$59$177$354
Materials$35$94$354
Labor$142$472$1,770
Permits$0$0$0
Total$177+18% vs. national avg$566+18% vs. national avg$2,124+18% vs. national avg

Budget

Small nail holes and hairline cracks, single room

Mid-Range

Fist-sized hole (3-6 inch), proper patch with backer, tape, mud, texture match

Premium

Large section replacement (2+ sq ft), texture matching across multiple repairs

Material Options

Material prices below are national averages; availability in Baltimore may shift costs slightly.

MaterialCost/UnitBest For
Spackle / Joint Compound (Small Holes)$5-$15 materialsNail holes, screw holes, hairline cracksEasy to apply, fast drying, paintable, DIY-friendly
Patch Kit with Self-Adhesive Mesh$10-$25 materialsMedium holes (3-6 inch) in out-of-the-way locationsEasy for 3-6 inch holes, no cutting required, good DIY option
California Patch (Drywall Scrap)$5-$15 materialsHoles 3-8 inches where a clean result is neededProfessional result, uses existing drywall, no backer board needed
Section Replacement (Cut and Replace)$50-$150 materials per sectionHoles over 8 inches, water damage, impact damageBest result for large or irregular damage, ties into studs
Spray Texture$15-$40 canDIY texture matching on orange peel or popcorn-adjacent finishesMatches orange peel and light knockdown texture well

Other Projects in Baltimore

Baltimore Estimate

Typical Range

$177$1,180

vs. National Average

18% above national

Cost Multiplier

1.18x

Cost Per repair

$59–$354

Estimates apply Baltimore's 1.18x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →