Cost to Garbage Disposal Installation in Providence, RI

$213$690 in Providence

15% above the national average · 1.15x cost multiplier

Homeowners in Providence typically spend $213–$690 on a garbage disposal installation, about 15% above the national average. Labor rates and contractor availability in the Northeast region drive much of the price difference. Permit requirements and material delivery costs also play a role. See the full tier-by-tier breakdown below before requesting bids.

Cost Breakdown in Providence

Line ItemLowMidHigh
Cost per unit$98$431$690
Materials$115$288$575
Labor$144$230$402
Permits$0$0$0
Total$259+15% vs. national avg$518+15% vs. national avg$977+15% vs. national avg

Budget

Basic 1/3-1/2 HP unit (InSinkErator Badger or similar) replacing an existing disposal on an existing circuit. No new wiring needed.

Mid-Range

3/4 HP mid-range unit (InSinkErator Evolution or Moen) with quiet operation, replacing existing disposal or doing first-time install with existing outlet nearby.

Premium

1 HP or higher premium unit with multi-stage grinding, quiet motor, and auto-reverse. First-time install requiring a new dedicated circuit from panel.

Material Options

Material prices below are national averages; availability in Providence may shift costs slightly.

MaterialCost/UnitBest For
1/3 HP Basic Disposal$70-$110 unit onlyRentals, light use, budget installsLowest cost, handles soft food waste
1/2 HP Standard Disposal$100-$180 unit onlyMost average householdsGood for most households, reliable
3/4 HP Mid-Range Disposal$150-$280 unit onlyFamilies with regular kitchen useQuieter, handles more food types, longer lifespan
1 HP Premium Disposal$250-$500 unit onlyHigh-use households, premium kitchen remodelsVery quiet, handles virtually all food waste, 8-12 year lifespan
Septic-Safe Disposal$200-$400 unit onlyHomes on septic systemsAdds septic enzymes to waste stream, designed for septic systems

Other Projects in Providence

Providence Estimate

Typical Range

$213$690

vs. National Average

15% above national

Cost Multiplier

1.15x

Cost Per unit

$98–$690

Estimates apply Providence's 1.15x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →