Cost to Full Kitchen Remodel in Minneapolis, MN

$15,225$43,575 in Minneapolis

5% above the national average · 1.05x cost multiplier

In Minneapolis, a full kitchen remodel runs $15,225 to $43,575 on average — about 5% above what homeowners pay nationwide. The Midwest market's labor costs account for most of the gap, with material pricing and local permitting fees adding to the spread. Use the cost table below to compare budget, mid-range, and premium options side by side.

Cost Breakdown in Minneapolis

Line ItemLowMidHigh
Cost per sq ft$79$158$263
Materials$6,300$16,800$44,100
Labor$5,775$14,700$29,400
Permits$525$840$1,260
Total$12,600+5% vs. national avg$33,600+5% vs. national avg$78,750+5% vs. national avg

Budget

Cosmetic refresh - paint cabinets, new hardware, laminate countertops, budget appliances, LVP flooring

Mid-Range

New semi-custom cabinets, quartz countertops, mid-range appliances, tile backsplash, hardwood flooring

Premium

Custom cabinets, marble or premium quartz countertops, professional-grade appliances, custom lighting, structural changes

Material Options

Material prices below are national averages; availability in Minneapolis may shift costs slightly.

MaterialCost/UnitBest For
Laminate Countertops$20-$50/sq ftBudget remodels, rental propertiesMost affordable, many styles available
Granite Countertops$40-$200/sq ftMid-range to premium remodelsNatural stone, heat resistant, high-end look
Quartz Countertops$50-$200/sq ftMost popular mid-range to premium choiceLow maintenance, consistent color, very durable
Marble Countertops$100-$250/sq ftPremium remodels, statement piecesLuxury aesthetic, unique veining, high resale value
Butcher Block Countertops$35-$200/sq ftFarmhouse or traditional kitchen stylesWarm look, food-safe surface, repairable

Other Projects in Minneapolis

Minneapolis Estimate

Typical Range

$15,225$43,575

vs. National Average

5% above national

Cost Multiplier

1.05x

Cost Per sq ft

$79–$263

Estimates apply Minneapolis's 1.05x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →