Cost to Dishwasher Installation in Tampa, FL (2026)
If you’re budgeting a dishwasher installation in Tampa, most projects run $96-$305, 13% below the $190 national average. What moves that number most is usually one thing: Replacement vs. First-Time Installation. On its own it can swing the cost by $110 - $600, so that’s the decision to slow down on before you sweat the smaller stuff.
Easiest place to save: Buy the dishwasher from a big-box retailer and add their installation add-on at checkout - Home Depot and Lowes both offer basic installation add-ons for $110-$159 that include haul-away, which is often cheaper than hiring an independent plumber
In the Southeast (where Tampa sits): Lower labor rates across the region; Florida coastal markets run slightly higher due to licensed trade minimums.
$96-$305 in Tampa
13% below the national average · 0.87x cost multiplier
Homeowners in Tampa typically spend $96-$305 on a dishwasher installation, about 13% below the national average. Labor rates and contractor availability in the Southeast region drive much of the price difference. Permit requirements and material delivery costs also play a role. See the full tier-by-tier breakdown below before requesting bids.
Cost Breakdown in Tampa
| Line Item | Low | Mid | High |
|---|---|---|---|
| Cost per installation | $65 | $165 | $522 |
| Materials | $0 | $49 | $146 |
| Labor | $91 | $136 | $289 |
| Permits | $0 | $0 | $73 |
| Total | $91-17% vs. national avg | $185-14% vs. national avg | $508-12% vs. national avg |
Budget
Direct swap of an existing dishwasher using existing water supply, drain, and electrical connections. No modifications needed - the installer disconnects the old unit, slides in the new one, and reconnects. Typical of a big-box store or appliance retailer installation add-on.
Mid-Range
Replacement where the supply line or drain hose needs to be rerouted or replaced, or a new braided stainless supply line and angle-stop valve are required. New mounting brackets and junction box cover may also be needed. Most homeowner upgrades fall into this range.
Premium
First-time installation in a kitchen that has never had a built-in dishwasher. Requires running a new hot water supply line, adding a drain connection at the sink drain or garbage disposal, and installing a dedicated 120V/15A or 20A electrical circuit. Permits required in many jurisdictions.
Material Options
Material prices below are national averages; availability in Tampa may shift costs slightly.
| Material | Cost/Unit | Best For |
|---|---|---|
| Braided Stainless Supply Line (3/8 in.) | $12-$25 each | Any replacement install; should be replaced any time the old supply line is rubber or shows crackingFlexible, kink-resistant, rated for 125 PSI - far more durable than the rubber lines that shipped with older dishwashers |
| Angle-Stop Shutoff Valve (3/8 in. compression) | $10-$30 each | Any installation where no dedicated shutoff exists, or where the existing valve is corroded or a gate-type valveProvides a dedicated water shutoff for the dishwasher without turning off the whole kitchen supply; required in most jurisdictions |
| Drain Air Gap (countertop or cabinet) | $8-$35 each | New installations, California kitchens, or any kitchen without an existing high-loop drain configurationPrevents backflow of sewage into the dishwasher if the drain gets clogged; required by plumbing code in California and several other states |
| Electrical Junction Box and Strain Relief | $8-$20 kit | First-time installations or whenever the existing junction box is absent or shows corrosionProvides a safe, code-compliant electrical connection point inside the dishwasher compartment; protects wire connections from moisture |
Other Projects in Tampa
Tampa Estimate
Typical Range
$96-$305
vs. National Average
13% below national
Cost Multiplier
0.87x
Cost Per installation
$65-$522
This 0.87x estimate prices Tampa labor from BLS Occupational Employment and Wage Statistics (May 2025) and applies a lighter regional adjustment to materials and permits, which vary less by metro than labor does. Actual bids vary by contractor, project scope, and timing.
See national average costs →