Cost to Skylight Installation in Providence, RI

$1,380$4,025 in Providence

15% above the national average · 1.15x cost multiplier

Homeowners in Providence typically spend $1,380–$4,025 on a skylight installation, about 15% above the national average. Labor rates and contractor availability in the Northeast region drive much of the price difference. Permit requirements and material delivery costs also play a role. See the full tier-by-tier breakdown below before requesting bids.

Cost Breakdown in Providence

Line ItemLowMidHigh
Materials$460$1,035$2,300
Labor$575$1,035$1,380
Permits$115$173$230
Total$1,150+15% vs. national avg$2,243+15% vs. national avg$4,025+15% vs. national avg

Budget

Fixed curb-mount skylight, standard dual-pane glass, basic flashing kit

Mid-Range

Venting deck-mount skylight with Low-E glass, integrated flashing, solar-powered blind

Premium

Large electric venting skylight or sun tunnel, triple-pane glass, light shaft through attic, remote control

Material Options

Material prices below are national averages; availability in Providence may shift costs slightly.

MaterialCost/UnitBest For
Fixed Skylight$200-$500/unitHallways, closets, stairwells, areas needing light onlyMost affordable, no moving parts to fail, good for hard-to-reach areas
Manual Venting Skylight$400-$800/unitKitchens, bathrooms, reachable ceiling heightsAllows air circulation, crank or push-bar operation, moderate cost
Electric/Solar Venting Skylight$700-$1,500/unitHigh ceilings, bedrooms, smart home integrationRemote or app control, rain sensors auto-close, solar models qualify for tax credits
Tubular Sun Tunnel$200-$600/unitBathrooms, closets, hallways, tight attic spacesLeast expensive, minimal roof penetration, fits in tight spaces, easy install

Other Projects in Providence

Providence Estimate

Typical Range

$1,380$4,025

vs. National Average

15% above national

Cost Multiplier

1.15x

Estimates apply Providence's 1.15x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →