Cost to Skylight Installation in Los Angeles, CA

$1,620$4,725 in Los Angeles

35% above the national average · 1.35x cost multiplier

In Los Angeles, a skylight installation runs $1,620 to $4,725 on average — about 35% above what homeowners pay nationwide. The West Coast market's labor costs account for most of the gap, with material pricing and local permitting fees adding to the spread. Use the cost table below to compare budget, mid-range, and premium options side by side.

Cost Breakdown in Los Angeles

Line ItemLowMidHigh
Materials$540$1,215$2,700
Labor$675$1,215$1,620
Permits$135$203$270
Total$1,350+35% vs. national avg$2,633+35% vs. national avg$4,725+35% vs. national avg

Budget

Fixed curb-mount skylight, standard dual-pane glass, basic flashing kit

Mid-Range

Venting deck-mount skylight with Low-E glass, integrated flashing, solar-powered blind

Premium

Large electric venting skylight or sun tunnel, triple-pane glass, light shaft through attic, remote control

Material Options

Material prices below are national averages; availability in Los Angeles may shift costs slightly.

MaterialCost/UnitBest For
Fixed Skylight$200-$500/unitHallways, closets, stairwells, areas needing light onlyMost affordable, no moving parts to fail, good for hard-to-reach areas
Manual Venting Skylight$400-$800/unitKitchens, bathrooms, reachable ceiling heightsAllows air circulation, crank or push-bar operation, moderate cost
Electric/Solar Venting Skylight$700-$1,500/unitHigh ceilings, bedrooms, smart home integrationRemote or app control, rain sensors auto-close, solar models qualify for tax credits
Tubular Sun Tunnel$200-$600/unitBathrooms, closets, hallways, tight attic spacesLeast expensive, minimal roof penetration, fits in tight spaces, easy install

Other Projects in Los Angeles

Los Angeles Estimate

Typical Range

$1,620$4,725

vs. National Average

35% above national

Cost Multiplier

1.35x

Estimates apply Los Angeles's 1.35x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →