Cost to Generator Transfer Switch Installation in Boise, ID

$735$2,100 in Boise

5% above the national average · 1.05x cost multiplier

Expect to pay $735–$2,100 for a generator transfer switch installation in Boise, about 5% above the national benchmark. The Mountain West region's contractor market and material costs account for most of this difference. The detailed breakdown below shows how budget, mid-range, and premium projects compare at Boise prices.

Cost Breakdown in Boise

Line ItemLowMidHigh
Materials$210$525$1,260
Labor$263$525$840
Permits$79$105$158
Total$551+5% vs. national avg$1,155+5% vs. national avg$2,363+5% vs. national avg

Budget

Manual transfer switch (6-10 circuits) for portable generator, basic installation at panel

Mid-Range

Manual transfer switch (10-16 circuits) or manual transfer panel with inlet box and weatherproof connection

Premium

Automatic transfer switch (ATS) for standby generator with whole-panel coverage and load management

Material Options

Material prices below are national averages; availability in Boise may shift costs slightly.

MaterialCost/UnitBest For
Manual Transfer Switch (6-10 circuits)$150-$350Portable generator owners who want safe, code-compliant backup power for essentialsAffordable, simple, works with any portable generator, no electrical complexity
Manual Transfer Panel (10-16 circuits)$300-$600Homeowners who want broader coverage from a portable generatorCovers more circuits, clean installation, some models include watt meters
Automatic Transfer Switch (ATS) - 100A$500-$1,200Standby generator installations for homes up to 2,500 sq ftHands-free operation, detects outages automatically, required for standby generators
Automatic Transfer Switch (ATS) - 200A$800-$2,000Whole-house standby generators on larger homes with 200-amp serviceWhole-house coverage, load management capability, handles large generators

Other Projects in Boise

Boise Estimate

Typical Range

$735$2,100

vs. National Average

5% above national

Cost Multiplier

1.05x

Estimates apply Boise's 1.05x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →