Cost to Shower Door Replacement in Tucson, AZ

$651$1,767 in Tucson

7% below the national average · 0.93x cost multiplier

Expect to pay $651–$1,767 for a shower door replacement in Tucson, about 7% below the national benchmark. The Southwest region's contractor market and material costs account for most of this difference. The detailed breakdown below shows how budget, mid-range, and premium projects compare at Tucson prices.

Cost Breakdown in Tucson

Line ItemLowMidHigh
Materials$186$512$1,674
Labor$186$326$558
Permits$0$0$0
Total$372-7% vs. national avg$837-7% vs. national avg$2,232-7% vs. national avg

Budget

Basic framed sliding door with standard clear glass in a standard-size opening.

Mid-Range

Semi-frameless hinged door with tempered glass and brushed nickel hardware.

Premium

Frameless heavy glass panel door with custom hardware and specialty glass finish.

Material Options

Material prices below are national averages; availability in Tucson may shift costs slightly.

MaterialCost/UnitBest For
Framed Sliding Door$200-$500Budget-conscious updates on standard tub/shower combosMost affordable option, easy to find standard sizes, low-profile tracks
Semi-Frameless Hinged Door$400-$900Mid-range bathroom updates balancing style and budgetClean look with some structural support, wide range of styles, easier to clean than framed
Frameless Glass Panel$800-$2,200Upscale bathroom remodels and walk-in showersModern spa-like appearance, easy to clean, makes bathroom feel larger
Bypass/Sliding (Frameless)$600-$1,400Tub/shower combos in tight bathrooms wanting a modern lookNo swing clearance needed, frameless look, works well for tub/shower combos

Other Projects in Tucson

Tucson Estimate

Typical Range

$651$1,767

vs. National Average

7% below national

Cost Multiplier

0.93x

Estimates apply Tucson's 0.93x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →