Cost to Frameless Glass Shower Door in San Antonio, TX

$801$3,115 in San Antonio

11% below the national average · 0.89x cost multiplier

Expect to pay $801–$3,115 for a frameless glass shower door in San Antonio, about 11% below the national benchmark. The Southeast region's contractor market and material costs account for most of this difference. The detailed breakdown below shows how budget, mid-range, and premium projects compare at San Antonio prices.

Cost Breakdown in San Antonio

Line ItemLowMidHigh
Cost per project$445$1602$5340
Materials$356$1,068$2,492
Labor$267$534$1,068
Permits$0$0$0
Total$623-11% vs. national avg$1,602-11% vs. national avg$3,560-11% vs. national avg

Budget

Semi-frameless pivot door, 3/8-inch glass, standard hardware.

Mid-Range

Frameless hinged door, 3/8-inch glass, brushed nickel hardware.

Premium

Custom frameless panel system, 1/2-inch glass, premium hardware.

Material Options

Material prices below are national averages; availability in San Antonio may shift costs slightly.

MaterialCost/UnitBest For
Framed Sliding Door$300-$700 installedBudget updates, rentals, small showersLowest cost, widely available, easy to find a replacement if damaged
Semi-Frameless Pivot Door$500-$1,200 installedMid-range bathroom upgradesBetter look than framed, lower cost than fully frameless, widely available
Frameless Hinged Door$900-$2,500 installedPrimary bath upgrades, custom tile showersClean modern look, easy to clean, high perceived value
Custom Frameless Panel System$2,000-$6,000 installedLarge walk-in showers, luxury bathroomsCovers large openings or non-standard shapes, maximum design flexibility
Neo-Angle Frameless$1,500-$4,000 installedCorner shower enclosures in mid-range and premium bathsFits corner shower configurations, space-efficient, modern look

Other Projects in San Antonio

San Antonio Estimate

Typical Range

$801$3,115

vs. National Average

11% below national

Cost Multiplier

0.89x

Cost Per project

$445–$5340

Estimates apply San Antonio's 0.89x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →