Cost to Bathtub to Shower Conversion in Austin, TX

$2,625$10,500 in Austin

5% above the national average · 1.05x cost multiplier

Homeowners in Austin typically spend $2,625–$10,500 on a bathtub to shower conversion, about 5% above the national average. Labor rates and contractor availability in the Southeast region drive much of the price difference. Permit requirements and material delivery costs also play a role. See the full tier-by-tier breakdown below before requesting bids.

Cost Breakdown in Austin

Line ItemLowMidHigh
Cost per project$1260$5775$18900
Materials$840$2,625$6,300
Labor$1,260$2,625$5,250
Permits$210$420$630
Total$2,310+5% vs. national avg$5,670+5% vs. national avg$12,180+5% vs. national avg

Budget

Prefab shower unit, keep existing drain, new fixtures.

Mid-Range

Custom tile shower, new drain, glass doors, recessed niche.

Premium

Walk-in, frameless glass, custom tile, linear drain, bench.

Material Options

Material prices below are national averages; availability in Austin may shift costs slightly.

MaterialCost/UnitBest For
Prefab Acrylic Surround$400-$1,000 unitRentals, quick flips, budget conversionsLow cost, fast installation, seamless surface, no grout to clean
Custom Tile$1,500-$6,000 for standard size (materials + setting)Primary bathrooms, design-forward remodelsUnlimited design options, durable, increases home value
Cultured Marble$800-$2,500 unitMid-range conversions where low maintenance is a priorityNon-porous (no grout), custom-cut to fit, durable and easy to clean
Frameless Glass Enclosure$1,500-$4,500 installedMid-range to premium custom tile conversionsOpen, airy look; easy to clean; premium appearance
Sliding Glass Door$400-$1,200 installedSmall bathrooms, budget conversionsAffordable, space-efficient (no swing clearance needed)

Other Projects in Austin

Austin Estimate

Typical Range

$2,625$10,500

vs. National Average

5% above national

Cost Multiplier

1.05x

Cost Per project

$1260–$18900

Estimates apply Austin's 1.05x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →