Cost to Full Bathroom Remodel in Phoenix, AZ

$6,175$17,100 in Phoenix

5% below the national average · 0.95x cost multiplier

In Phoenix, a full bathroom remodel runs $6,175 to $17,100 on average — about 5% below what homeowners pay nationwide. The Mountain West market's labor costs account for most of the gap, with material pricing and local permitting fees adding to the spread. Use the cost table below to compare budget, mid-range, and premium options side by side.

Cost Breakdown in Phoenix

Line ItemLowMidHigh
Cost per sq ft$71$114$261
Materials$2,280$5,700$14,250
Labor$3,040$6,840$16,625
Permits$143$285$380
Total$5,700-5% vs. national avg$13,300-5% vs. national avg$33,250-5% vs. national avg

Budget

Basic updates - refinish tub, new vanity, repaint, new hardware, vinyl flooring

Mid-Range

New tile shower, new vanity with quartz top, porcelain tile floor, new toilet, updated lighting

Premium

Custom walk-in shower with glass door, freestanding tub, heated floor, custom vanity, premium tile throughout

Material Options

Material prices below are national averages; availability in Phoenix may shift costs slightly.

MaterialCost/UnitBest For
Ceramic Tile$10-$20/sq ft installedBudget and mid-range remodelsMost affordable tile option, wide variety of colors and styles
Porcelain Tile$12-$30/sq ft installedMost popular mid-range choice for wet areasVery durable, low water absorption, works for floors and walls
Natural Stone Tile$20-$50/sq ft installedPremium remodels and accent featuresLuxury look, unique patterns, high resale value
Fiberglass Shower Surround$300-$1,000 installedBudget remodels, rental propertiesFast install, waterproof, low cost
Custom Tile Shower$2,500-$10,000 installedMid-range to premium remodelsFully customizable design, premium look, durable

Other Projects in Phoenix

Phoenix Estimate

Typical Range

$6,175$17,100

vs. National Average

5% below national

Cost Multiplier

0.95x

Cost Per sq ft

$71–$261

Estimates apply Phoenix's 0.95x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →