Cost to Bathroom Plumbing Rough-In in Baltimore, MD

$2,950$9,440 in Baltimore

18% above the national average · 1.18x cost multiplier

Expect to pay $2,950–$9,440 for a bathroom plumbing rough-in in Baltimore, about 18% above the national benchmark. The Northeast region's contractor market and material costs account for most of this difference. The detailed breakdown below shows how budget, mid-range, and premium projects compare at Baltimore prices.

Cost Breakdown in Baltimore

Line ItemLowMidHigh
Cost per fixture$590$1416$2950
Materials$944$1,770$3,540
Labor$2,360$4,130$8,260
Permits$708$944$1,770
Total$4,012+18% vs. national avg$6,844+18% vs. national avg$13,570+18% vs. national avg

Budget

Single bathroom, close to existing stack, supply and drain.

Mid-Range

Full bathroom rough-in, moderate distance from stack, proper venting.

Premium

Remote location, slab penetration or long run, complex venting.

Material Options

Material prices below are national averages; availability in Baltimore may shift costs slightly.

MaterialCost/UnitBest For
PEX Supply Lines$0.50-$1.50/ftMost residential supply line applications; the dominant choice in new constructionFlexible, freeze-resistant, fast to install, less expensive than copper
Copper Supply Lines$2-$4/ftHomes with existing copper systems where matching is requiredLong-lasting, naturally antimicrobial, handles high heat
ABS Drain Pipe$1-$2/ftNew construction and additions in areas where it's code-approvedLightweight, easy to cut and glue, lower cost than cast iron
PVC Drain Pipe$0.80-$1.50/ftStandard drain and vent applications in most residential projectsWidely code-approved, durable, resistant to chemicals
Cast Iron Drain$3-$8/ftMatching existing cast iron systems in older homesVery quiet, extremely durable, required in some jurisdictions

Other Projects in Baltimore

Baltimore Estimate

Typical Range

$2,950$9,440

vs. National Average

18% above national

Cost Multiplier

1.18x

Cost Per fixture

$590–$2950

Estimates apply Baltimore's 1.18x regional cost multiplier to national averages. Actual bids vary by contractor, project scope, and timing.

See national average costs →